1. Our company fully implements and undertakes all the provisions specified in the contract documents, is responsible for the construction and maintenance of the contract project, and is equipped with the required personnel and mechanical equipment as required to ensure the project progress, project quality and safety of the construction site.
2. Complete the project on schedule and comply with relevant laws and regulations.
3. The person in charge of the construction site appointed by our company handles the daily construction and maintenance of the construction site on our behalf. During the project construction, we are responsible for keeping in touch and cooperating with the Owner, the civil engineering unit, the installation unit, the supervision unit and the design unit, and exchanging the technical data and data of the project construction and equipment on time according to the instructions of the supervision engineer assigned by the Owner.
4. Construction management
4.1 After signing the contract, our company will start the construction preparation and enter the construction site within 10 days after receiving the mobilization notice.
4.2 Before formal commencement, our company must further carefully review the design drawings and conduct on-site verification. After fully understanding the design requirements and verifying the site, we shall prepare the construction design, construction schedule, material and equipment procurement plan, and project payment plan.
4.3 In order to ensure good project quality and planned progress, our company must carefully check, measure and debug each process, and fill in the construction diary and various records of the day, so that the project can be inspected at any time.
4.4 During construction, our company is fully responsible for the safety of its contracted scope of work. All safety and quality accidents caused by the supplier's mismanagement or negligence shall be borne by the contractor, and the owner will not bear any responsibility and pay any costs.
5. Installation, commissioning and trial operation
5.1 Our company sends technicians with more than five years of practical experience in similar work to carry out equipment installation, commissioning and operation until normal and stable operation is guaranteed.
5.2 During commissioning, our company is responsible for testing and commissioning on site. The test and commissioning methods and the format of the record sheet can be implemented only after your approval.
5.3 Guarantee test for more than 72 consecutive hours in the process of trial operation. The guarantee test items include the normality of all equipment, instruments, electrical components, etc. within the scope of this bidding, the stability of the system, and all operating indicators meet the requirements.